Trucks continue to roll through Bedford delivering steel shipments for the Milton-Madison Bridge Project. This load is one of about 300 expected over the coming months. Each load, weighing between 30,000–40,000 pounds, will arrive by flatbed truck from High Steel Structures, Inc., in Lancaster, Pa., where it was fabricated. The steel is painted grayish-blue. The materials are being stockpiled in the Milton staging yard.